It was time to get a new roof. We had one leak which we patched, but now we had another leak, this time in the garage. We could have patched that one too, but at some point we would just need to put on a new roof. 

We got four estimates. Each estimate involved talking to a roofing company. They would come out and look over the roof, and give options on what kind of new roofing material to put on. The original roof, from when the house was built, has a 50 year warranty. Now, 18 years later, it needed to be replaced. And, of course neither the original installer (the builder) nor the company that produced the shingles were still around. But if we could get another 20 years out of this roof, we probably would not be here to need to re-roof again. 

Each estimate covered the same basic job. Take off the old roof and putting down new felt underneath it, new flashing, and the new roof. 30-year warranty shingles. We also asked about a metal roof. A metal roof should be long lasting. 

Company A bid 7278 for the shingle roof, but didn't do metal roofs. 

Company B bid 7696 for the shingle, and 21,687 for a metal roof. 

Company C bid 8912 for the shingle, and 18,900 for a metal roof. 

Company D bid 7292 for the shingle, and 24,292 for a metal roof. 

We liked the idea of a metal roof, but for the price difference, it just didn't make sense. We could re-roof with regular asphalt shingles 3 times for the price of one metal roof. Even supposing that it would last 3 times (or more) longer, we don't expect to be in the house that long. 

So we went with Company D -- Aztec Roofing and Siding. Once that was decided, there were various details to contend with. We went with a 30-year GAF Timberline Cedar Blend shingle.

 

(We ended up getting a new roof in 2013, so only 9 years later. By then it cost $16,265)

They knew that we had a ridge vent along the top of the house, and would have to consider that.  At the same time, however, they took out the wind turbine vents and covered those holes. I had been reading that the wind turbines are both not helpful and can be problematic. They may be better than nothing, but a ridge vent combined with soffit openings will provide a smooth flow of air from the soffit openings to the ridge vent. The wind turbines cause turbulence in that flow, and reduce the cooling effect. 

At the same time, there were a couple of panels of plywood roof decking under the shingles that needed to be replaced -- these were in the location of the leak. I asked them to use a replacement plywood with a radiant barrier attached to the underside. Radiant barriers are supposed to help keep the heat down in the attic and thus prevent the heat from building up and being transmitted into the house. So we have a patchwork of roof decking -- most is normal plywood, but we have 4 sheets of radiant barrier. 

The result was a total cost of $7390.42. 

 The company did a good job. They tore off the old roof and dropped it into the back of a truck parked on the driveway. Then they replaced the roof decking that needed it, put down the new felt, and then the new shingles. It took all day -- they were cleaning up by flashlight after sundown, but they got it all done in one day. Since they were working so late, they missed some of the clean up items -- I found a number of shingles and nails the next day in the light. But it was adequate. 

In fact, it suggested an additional income possibility for them. They probably did the standard "magnet" sweep of the yard. They have a strong magnet on a pole and push it or wave it around to pick up nails. Only works on iron and steel nails, of course, and only if you cover the entire area close enough to the ground for the magnet to work. If you really wanted to do a good job, you probably would want to use one of those metal detectors that some people use at the beach to find coins and watches and such. If you could rent one for a day, and use it you might get a much better clean-up job. For more time, of course, and so it would be an extra-charge item -- the cost of renting the detector and the time of the person that operated it.

Thursday, December 11, 2003

Replacing the Back Deck

November, 2003

When the house was built, a deck was put along the back. The deck was a simple rectangle. The deck faces South; half of it is covered by the roof, half is exposed to the sun. There were stairs down along the house at both ends -- next to the dining room and next to the guest room. It basically consisted of 2x6 lumber, probably treated fir.

Over time, the deck aged, and we noticed one or more boards that were beginning to show more "give" than we felt comfortable with. So we started to consider replacing the deck with a newer deck.

Rather than just replacing it, we felt free to consider changing the design, and talked to a couple of companies, read some books, and so on. Eventually, we contracted with Legacy Custom Decks to take off the existing deck and do a new one in ipe (also called iron wood). We were told that the ipe was sustainably grown in Brazil.



The quote for this work was $10,656. We signed the contract on 18 Nov 2003 and the work was done by 11 Dec 2003.

The first step was to remove the old deck. I removed all the plantings around it. It had been overgrown with a rose bush, as well as having various bushes around it, and some monkey grass. I moved the monkey grass around to the side of the house, by the garage.



The supports underneath the old deck were generally still in good shape, so they were reused. The old deck and railing was removed.



Once the old deck was removed, they put the new deck on. The wood is so hard, that they drilled and screwed, instead of nailing.





After the deck was finished, it needed to be power-washed and sealed. Legacy suggested Deck Masters of Austin. On 16 Dec 2003, they power-washed and sealed at a cost of $655.50.

We refinished the deck in June 2005, and again in October 2010, when we did it ourselves. Since we already had a power washer, the only cost was for the deck stain/sealer. We used Australian Timber Oil Penetrating Finish. We needed 2.5 gallons, plus some lambs wool pads. Lowes carried both ($91.26). It took three days -- one to power wash, and two to recoat. We should have sanded between the power wash and the refinish.

Sunday, November 16, 2003

Moving the Monkey Grass

November 2003

To replace and expand the deck, we needed to clear out the space where the deck was being expanded. It had been landscaped with Japanese Boxwood and edged with monkey grass (or Mondo grass). The boxwood was not something we needed to keep, but the monkey grass seemed like it would be a waste to not reuse.

So we decided to move it to the side of the house by the kitchen and the garage. But of course, to do that we first needed to excavate this area, both to provide a good environment for the monkey grass, and because we would not be able to excavate after the monkey grass was planted.



We took a couple of weeks, and dug down to bedrock. We got about 3 feet down, pulling out rock and construction debris. We had to be careful of the main irrigation water supply line. Then we were able to fill it in with much better dirt and replant the monkey grass.

This has done fairly well. The main problems are (a) the dirt in the back, near the house has settled more than the rest, so there is a depression towards the house, and (b) the section under the garage roof overhang gets very little water.

Tuesday, November 4, 2003

The French Drain, Part 1

December 2002 to December 2003 

When the house was built, there was no fence. When we put the fence in, it only went between us and our neighbors, so it was still open to the front of the house. To keep the dog in the back yard, we needed to close it off, so we contracted for a guy to put in the section of the fence with gates on both the left and right side of the house. 

Before I did that, I wanted to make sure that there was enough dirt to put the fence posts in. When I dug down on the left (the East side), I got dry sandy dirt. On the right (the West side), I got water. The whole West side of the house was saturated with water. This was causing problems with the foundation of the house -- the outermost layer of the foundation was spalling off. 

and after it rained, the whole lawn was standing water. 

The problem was that there had been a swale that drained this part of the yard onto the empty lot next store, and then back and down the hill. But the empty lot had been built on and the builder filled in the swale, blocking the water from our front lawn which flowed down the yard, around the house and then just stopped. 

The solution was to dig a French drain to take all this water back down the hill. I dug a trench, about a foot wide down 2 to 3 feet. We then filled this with gravel and a couple of 4 inch PVC drainage pipes. This allows the water to filter thru the gravel and down the trench, past the slight raise that was keeping it in place. 

At the front of the house, the downspout from the gutters for the front of the house was tied directly into one of the drainage pipes in the French drain.

  

In addition, the other two drainage pipes just ran straight out to the lowest spot in the front yard. 

The trench, gravel, and drain pipes ran back under the fence and then turned left to run along side the fence to the back of the left side of the house.

At the end of the fence, we turn and continued until the back yard fell off enough that the yard was lower than the end of the drain pipe, so any water coming down it would drain off down the hill. 

This process took a year or so to dig out. I needed to be careful around the trees. Plus, as with much of the yard, the dirt is not very deep before I hit rock. These rocks had to be dug out to get down as far as possible -- generally down to bedrock about two to three feet down. Whenever a rock was encountered, a decision had to be made if it could be pulled out completely, or if it was too big to handle, and would have to be broken into pieces and removed. There were two sections where the bedrock itself was not level, but bulged up to stop the flow of water. I used a jackhammer to break thru these bulges to get a clear path for water entering the trench at the front yard to flow by gravity to the end of the trench. 

The actual installation of the pipe and rock, which is surrounded by a weed barrier form of landscape cloth, to allow water to flow in, but keep the dirt and roots away from the drainage pipes, was done by Drainage Specialist, for $2000 ($500 down, $1500 on completion). 

 This solved the drainage problem. It left us with a hole in the backyard with the three drainage pipes sticking in them, but we had other problems that needed to be worked on, and we weren't sure how to finish it off, so we just left it for later.

Monday, October 14, 2002

Third Mortgage Re-finance

With interest rates continuing to drop, it makes sense to refinance once more, for the sole purpose of decreasing our interest rate.  Since Chase has been doing a good job with the current mortgage, we approached them and asked if we could refinance to a lower rate.  They agreed.

We again refinanced with Chase Manhattan Mortgage, getting a 15-year fixed rate mortgage for $125,800 at 5.75%.  This paid the balance of the third mortgage of $125,823.32 plus closing costs.  Closing costs included title insurance ($768.20), but since the previous re-finance was so recent, we were able to skip the appraisal.


Monday, September 30, 2002

Painting the House

September 2002.  The house needed to be repainted. This time it was Steve Lindberg, $3260. This painted all the outside trim, the garage doors, and the exterior door to the back bedroom. 

First, there was a pwoer wash with bleach and soap.

Then all broken caulk areas were re-caulked, with Kelly Moore 45 year caulk.

Finally everything was painted.

 The outside trim is Sherwin-Williams Cuprinol SW 3507 Riverwood.


 

Wednesday, August 7, 2002

New A/C System

On 9 May 2002, I had the A/C system checked out to make sure that it would work for the upcoming summer. While it is working correctly, the technician said that it is "running high amps" and will fail under load. 

Since we should hardly need the A/C system in May, but will definitely need it in July thru September. So it seems like a good time to look for a new A/C system before it fails. I checked with 3 different companies. It seems that a good system would be a Trane XL1800, 16 SEER, 5 ton unit. We want to replace our existing system, both heating and cooling. The Trane XL1800 is common, and we can get comparative quotes. 

From 3 different suppliers we got: $8970, $9177, and $7624. An alternative was presented by Strand Brothers. They quoted a Lennox system which was SEER 14.5 for $6187. Instead of Freon, it uses 410A as a refrigerant. Plus it runs at variable speed, trying to minimize how much it has to do to reach a target temperature. 


 

But before we do that, we check with the City and they suggest we have our ducts checked. The duct work for our heating and A/C system run thru the attic. We've had all the ducts replaced once before, in April 1996, but the City believes that a lot of conditioned air is lost due to leaky ducts, so they are supporting a duct leakage analysis. We had our ducts tested on 3 June 2002. The duct leakage analysis showed that we both had duct leakage, but possibly more important, not enough air flow to properly cool most of the rooms. So we need the ducts sealed, but also modified to get the right amount of air, at the right temperature to all the rooms in the house. 


We contracted with Strand for both pieces of work. First, replace the existing heating and cooling system with a new Lennox system (both a gas furnace and A/C system), and second, modify the duct work to adjust the air flow and seal them. The contract, 8 June 2002, was $6187 for the replacement system and $2625 for the ductwork, for a total of $8712. 

I suffer from allergies, and so I would like the air conditioning system to also do the best it can to clean and filter the air. So we added onto this total $650 for a Honeywell Electronic Air Filter, and $395 for an ultra-violet light. The UV light goes anywhere in the air flow from the return air chamber to the top of the system where it branches for the various parts of the house and is supposed to help kill viruses and bacteria. 

We put $5000 down on 20 June 2002. The heating and A/C system was installed promptly and with little problem. The main issue was that the electronic air filter, installed just above the return air chamber raised the fan, furnace and evaporator coil. This makes it difficult to put the evaporator coil in place, and so it had to be turned 90 degrees from what was expected. 

But the duct work was more difficult; much more difficult. The ducts themselves were replaced and rebuilt according to plan, but they did not work as designed. The objective was to increase air flow to each of the rooms to be plus or minus 10% of what would be desired for that size of room. There were 18 registers. 

 


A spreadsheet was used to identify each register, the desired airflow, and the measured airflow. 

My idea was to have a concrete, objective criteria that defined if the work was "good enough". This seemed to cause significant problems. Strand expected to measure the current situation in order to establish that I needed work done, then design a solution to fix the situation, do the work, and declare it done. They did not normally go back and re-measure things to see if things actually improved. When we did, we found that some registers had improved, but others had not; some actually got worse. Before the work was done, we had 69% of the desired airflow; afterwards we were at 85%.  Better, but not what they promised.

The reduced air flow resulted in some additional changes to the duct work, and a larger evaporator coil, but still did not meet the goal. This got management involved, with different air filters and different measuring devices. The result seemed to be that first, the measuring devices were not very accurate and second, the measuring devices were not even repeatable. 

The measuring devices fit over a register and measured the amount of air coming out of it. Different instances of the measuring device gave different numbers. The same device would also give different results. Part of the problem was the Lennox system itself. It has a variable speed fan, and is reluctant to "blow at full speed". The result of this is that it is difficult to get the fan to run at full speed, or even a constant speed. Lennox apparently did not build into its controls a "test" mode which would just turn the fan on, full speed. 

Eventually, we got things done as well as they were going to be, but it was not easy. We never got the ultraviolet light, and the reusable electrostatic filters were deemed too restrictive to air flow, so we use disposable HEPA filters instead. 

One of the better features of this system turns out to be the warranty. The warranty is for 10 years parts and labor. 

 


This has turned out to be critical:

  • 23 May 2005 -- the system doesn't seem to be cooling. I have an A/C pocket thermometer, and it shows the air coming out of the closest register to be just barely cooler than the air going in to the return air closet. Turns out there is no coolant; the 410A coolant has leaked out. They put in more, but come back a couple days later and find a leak in the coil, so they replace the coil and recharge the system. This takes about 2 weeks altogether.
  • 1 July 2006 -- the compressor will not run. A bad "Dual Run Capacitor" is replaced.
  • 10 July 2008 -- internal electronics short out. The module controlling the blower motor is replaced.

Each time, Strand came out, found and fixed the problem. No charge. This should continue until 27 June 2012.

But Strand was none too happy about it.  They sent a letter in October 2008 saying that the system was no longer under warranty.  I sent back a copy of the original warranty, showing that it was still in effect until 2012. 


But the arguing ended up being unnecessary.  At this point, the system stopped breaking and just kept running for the next 10 to 12 years, when it was replaced by a Trane.

Saturday, July 20, 2002

Excavation and a Sidewalk in Front

December 2001 to July 2003

Linda suggested that she would like to put herbs in the peninsula between our driveway and the neighbor's driveway. So I dug up this area and removed all the rock, upgrading the soil and putting compost in to replace the rock.



In the above photo you can see both one of the large rocks that came out and the wheelbarrow full of the smaller rocks. Also you can see the irrigation lines.

The irrigation lines are of two types. The larger line is the main line that provides all the water to the entire sprinkler system. The water line from the city goes thru the water meter and then splits into the line for the irrigation system and the line that goes into the house. The main irrigation line goes straight back to the back of the house, turns right, goes across the back yard, turns right again, out to the front yard, turns right again, and across the front yard. The individual irrigation zones split off the main line as necessary.

The other irrigation line in the photo is the line for Zone 1, which runs back and provides sprinkler heads for the peninsula.


Once this area was dug up and improved soil brought in, Linda decided it was too shaded to grow herbs, so we have covered it with hardwood mulch and large landscape rocks.

In addition, it seemed that we needed a walk way to get from the garage and driveway around to the backyard. To do this, we outlined the area we wanted to be a walk way, and outlined it with a line of white limestone rocks. Then we took the dirt out of the walk way area and put in sand and decomposed granite, to form a base. Then we put stone on top of that base and filled in the space between the stones with a flexible grout.



The stone for the walkway is Oklahoma Thin Flagstone, with decomposed granite underneath, and Polimeric Sand as a grout. We got these from Custom Stone Supply, $398.05.

Wednesday, July 3, 2002

Converting a Bedroom into a Loft

Spending a lot of time in the attic suggested that there were two main areas where there was a lot of space -- over the kitchen and over the bedrooms. I thought that the space over the bedroom could be used by taking the ceiling off the bedroom to make it more open and provide access to the attic area. I figured this would be a major change and take a lot of time. And I had only a vague concept of what I would be doing.

So how to determine what exactly to do? I figured I needed professional help, so I looked for an Architect. I found "The Studio of 2 on Sixth", a small studio with a husband/wife team of architects: James Linville and Lina Husodo. They really brought my ideas into reality. They took our old blue prints for the house, scanned them in and converted them to a new computer file. (In the process, they also flipped everything over -- the construction of the house was the mirror image of the blue prints). They built a cardboard model of the house, with a removable roof, so you could see the way everything would fit together. Which was a really good idea, since my mental model was taking the roof off the wrong bedroom. The architects worked from June 2000 to December 2000, and billed by the month, but altogether cost $2468.20.

The architects also put us in contact with KWR Services. KWR Services did an analysis of the impact on ventilation, insulation, and heating/AC issues. This analysis is what drove the decision to install a roof ridge vent and soffit vents.

Plus, the architects considered that if we removed the ceiling from the bedroom, that might make a difference in the structural construction in the exterior wall. The framing for the bedroom ceiling effectively acted to support the middle of the exterior wall. KWR suggested a structural engineer, who suggested that we stiffen the exterior wall by installing a double 2 x 12 the length of the room along the exterior wall, between the "first floor" and the "second floor".


One thing I did was to get a building permit. It seemed likely to me that I would need one -- I wasn't sure. As I happened to be downtown near the building permit office, I stopped in and asked for one. Big mistake. They wanted to see plans, and cost estimates, and schedules. I guessed it would take years to do, and maybe cost $4000, and wasn't sure what would be done. But they were eventually happy to issue me a permit, charge me $110 (20 Nov 2000) and send me on my way, with a permit for "Remodel Attic Space for Loft/Storage Area", and some brochures about permits and inspections.

Most of 2001 was spent in getting things ready for the remodelling work. We needed the roof ridge vent and soffits. I replaced roof supports and extended the catwalk in the attic. I reinforced the floor over the kitchen and doubled the amount of fiberglass insulation over the dining room, living room and kitchen. We had the wind turbines and the power roof vent removed and the roof patched, and then I installed a solar radiant barrier on the attic side of the roof in these areas. I contracted with All Year Heating and Cooling to move some of the A/C ducts, to get them out of the way, extend the ducts to the utility room and master bedroom closet.

Now we were ready for the major remodelling. We contracted with Masterpiece Remodeling to remove the old roof and reframe the new walls and floors. This started 1 Nov 2001, and was done by 8 Nov 2001. This just provided the rough framing. $9100. This also included installing the windows (see below) in the new exterior wall. The previous framing and cedar siding for the gable had to be removed and rebuilt. We took the opportunity to replace the cedar siding with a stone siding that matched the first floor, all the way up.

The design called for two new windows -- a small double-hung window in one of the loft areas, and a larger fixed window above the windows in the bedroom. Both of these were ordered ahead of time from Home Depot. $205.66 for the small double-hung window, an Andersen wood window TW18210 20 inches by 33 inches plus $328.86 for a 5 foot wide by 3 foot tall picture window, Andersen P5030. (ordered 29 October 2001, picked up 25 Nov 2001)

We called All-Year Heating and Cooling back to run new ducts for the new space -- the upstairs loft area (two new registers, plus re-running ducts for the bedroom itself. $1200 (29 Nov 2001), plus another $550 to McCullough Heating & Air Conditioning (19 Dec 2001)

It was clear that we would need changes to the electrical power and probably new circuits. While we would prefer to run them from the main circuit breaker box, that seemed really difficult, so we instead installed one big line to a new secondary circuit breaker in the attic. Jimmie Farrell Electric did this for us. $963.80 (15 Nov 2001). With the circuit breaker in place, I can then run the lines for the outlets and lights myself.



After the electrical wiring was done, as well as telephone and CAT5 cabling for computer and cable communication, I called for my first inspection for the electrical work, 26 December 2001. I mostly passed, but I needed to ground each outlet to the metal boxes, so I would need to do that and then have a re-inspection. In the meantime, it was passed to close off the walls with sheetrock.

The sheetrock work was done by John Hernandez, for $2800. He installed the sheetrock, taped and floated it to cover the seams and make it smooth, and then added a texture to the walls to match the rest of the house. It took 3 days, from 20 Feb to 22 Feb 2002.

We did the painting ourselves. We primed the sheetrock first with one coat of Glidden Speed Wall PVA Primer, white, 4 gallons. Then we use Ralph Lauren paints. Most of the room (and the loft) was done in GH109 Greenhouse Sunlight, 4 gallons.

 One wall was done in Naturals Pueblo NA39, 1 gallon, as an accent.

 

We also got two custom doors made by Home Depot. One short door for the access to the attic over the back bedroom, and one short door for access to the attic over the rest of the house. These were just the standard Lauan interior hollow core doors, but 24 x 36 inches for the one and 24 x 52 inches for the other. $219.59, ordered 16 Jan 2002, and picked up 9 Feb 2002.

We bought a Hunter ceiling fan (Model 23853, $552.92) 9 March 2002 with a 4 arm light kit for comfort and lighting. We put fluorescent lights in the loft itself, as well as a smoke detector (since heat rises).

Now we were ready for the floor. We had a 3/4 inch plywood subfloor. It would have been nice to match the oak flooring from the rest of the house, but instead we went with a pre-finished engineered flooring -- Huntington Plank by Robbins, in a Shara Sand finish. Texas Floors supplied the material and installed it for $1952.00 with the installation on 21 and 22 March 2002.

Baseboards and window trim was obtained from Wenco Distributors. They had red oak trim that matched the trim in the rest of the house pretty well. $313.93 on 5 March 2002 for the baseboards and $148.80 on 20 March for the window and door trim. We got James R. Mattocks to install the trim for $720 on 26 March 2002. He also enclosed the double 2x12 stiffening beam along the exterior wall with oak trim to look like a shelf, and topped the half-wall by part of the loft with a nice piece of oak.

One of the intended uses of this space was to hold books. After the framing was roughed in, I noticed that there was space over the master closet and decided to put some recessed bookcases into that loft wall. I framed it all out and then ordered 3 bookcases 42 inches wide, by 33.5 inches high and 10.5 inches deep from the Bookcase Store on 2 March 2002 ($353.98). They were ready on 23 March, and we just slid them into place, then secured them by nailing their wooden trim to the wall.


(Later, in September 2006, we would buy 4 more custom made bookcases from the Bookcase Store for $428.67 and put them along the other wall).

April 2002 was spent finishing the bookcases and trim. Everything had to be sanded and two coats of polyurethane applied.

Now the problem was how to get up (and down) from this space. During all the work, we were just using a step ladder to get up and down, but we needed something better. Our solution was to order a library ladder from Putnam Rolling Ladder Co. We ordered the #1 Top Bent ladder with Satin Nickel hardware, for $1293.00 on 22 March 2002, and took delivery on 29 May, with an extra cost of $118.13 for shipping.


This pretty well finished the work. I called for my final inspections and got (and passed) them on 28 June (Electric and Building) and 3 July 2002 (Heating and A/C).

So it took about 2 years and over $20,000. It opened up the room and added about 200 square feet of left storage space. That's expensive storage space!


Saturday, May 11, 2002

A window in the Attic

Working in the attic is hot, and dark. I have a trouble light that I use, but one light bulb is not a lot of help. To help solve both these problems, I installed a window in the gable over the kitchen.

The window is a Model G42 Andersen Gliding Window. $524.06 from Home Depot


 Since it was a "new" install in an open wall, I could frame it in the attic to match the size of the window, which is basically 4 feet wide and 1 foot, 11 inches tall.

 On the outside, I trimmed it with 1x4 rough cedar to match the rest of the house, and on the inside, insulation and radiant barrier.