Monday, September 5, 2016

The Back Bedroom Bed, Part 3

We are continuing the excavation to the bed by the Back Bedroom, after pouring the first part of the concrete wall sealing off the foundation.  A couple of days of digging gets us enough dirt to, when mixed with leaves and grass, fill in the deep area next to the concrete wall.


This also gets us to the point we need to use the jackhammer again, to break up the rock that has been uncovered.


We clean those rocks up.


And continue digging to the end of the bed to expose more rocks.






which brings out the jackhammer to break these up.





And these are also hauled around front to be gotten rid of.


And after another day of digging and hauling off rock, we should be ready to frame the cement wall to run along the foundation.