We were gone for the month of January, and now all the tile has been set.
In the master bathroom, the shower has been defined.
including an accent piece on the back wall
and niches around where the shower head will be
The wall at the end of the room has been completely tiled to match the shower wall tile.
That wall tile matches the new floor tile for the part of the bathroom floor that is not the shower.
In the Central Bathroom, we have a different floor tile
And a new tub -- slightly taller. It's considered a soaking tub.
And a redo of the tile around the tub. with a niche and new plumbing.
No comments:
Post a Comment