Thursday, November 21, 2024

Rebuilding the Computer Room Closet

 To allow the wood floors to be refinished, I removed the storage unit that was in the closet of the Computer Room.  This left an empty closet, with some rails and brackets for shelves down the left side.


We wanted to do the same sort of storage unit in the middle, but with just shelves -- no drawers.  And also put shelves down the right to match the ones on the left.  So we bought a ClosetMaid 25 inch Wide Tower for the middle (Home Depot, $167.98).

This came as a flat pack of shelves and sides and had to be put together, like from IKEA.  I modified the two side supports to allow for our baseboards and slid it into place.


Next we took out the old wood shelves from when the house was built that were hidden on the right side of the closet.  They were supported by 1x2 pieces nailed onto the walls.


We then had to patch the sheetrock and paint the walls to match the wall color.   Then we bought and installed new shelf rails, to match the ones on the left side.


We also bought 6 new white wood shelves and twelve brackets to support them.  Home Depot, $196.81)

We put the brackets on the rails, and then the shelves on the brackets.


The closet is about 8 feet wide.  So a 3 foot shelf, the 24 inch storage unit, and another 3 foot shelf fits in pretty well.  There is about 1/2 inch of space left.  We jammed 1/2 and 3/8 square dowels between the shelves and the storage unit on the right, to fill the gap and hold everything rigidly in place.


 To finish things off, we added a third vertical rail in the corner on the right, so that the shwlves were stable.

On the left, there are no studs to put a third rail on, so we drilled holes in the side of the storage unit and put pegs in them to support the edge of the shelves.

We also raised the lowest shelf in the storage unit to allow our rolling cart to fit in the bottom of the storage unit.


 


Thursday, November 7, 2024

Widening the Shelves in the Master Bedroom Closet

 When we were putting things back into the Master Bedroom Closet, after having the floors refinished, I remembered that the shelves over the clothes always seemed to be not quite deep enough.  Pillows and blankets and quilts always seemed to want to flow over the front edge.  But the supports for the shelves would have allowed them to be deeper.


So I thought, why not add a 1x3 to the length of the shelf, bringing it another 3 inches out?  The shelves have a routed edge on the front, so we probably want to add the space to the back end, effectively moving the existing shelf out 3 inches and filling in the space created in the back.


We bought 2 pieces of 1x3 7 feet long.  The current shelves are pine, stained to look like oak, but such a long span, unsupported except at the ends suggests we would do better with a hardwood.  Home Depot only had two hardwoods -- white oak and poplar.  We picked poplar (much less expensive) for $26.16 and then stained it to be closer in color to the existing shelf.

While we were at it, we took the two shelves, sanded them down and put a coat of polyurethane on the top side.  We also put a coat of polyurethane on the 1x3's.


Leaving that to dry overnight, the next day we were able to reinstall the shelves plus their extensions in the closet.


Along the way, we realized that there is another similar set of shelves on the other side of the closet with the same problem, asking for a similar solution.  And maybe we should check all the other closets.

 Update:  After a couple weeks, I noticed that the two boards -- the larger one and the new 1x3 -- were bowing in different ways, creating a definite disjointed nature at the joint where they abut.  It seemed the easiest way to fix this was to tie them together, and the simplest way to do that would be with a mending plate.  So I bought a pack of 4 bronze colored mending plates and screws from Home Depot and put two on each of the two shelves.  They divide the length of the shelf (7 feet) into three 28-inch  sections.





Saturday, November 2, 2024

Refinishing the Hardwood Floors

 Both with the bathroom remodeling and the interior painting, the workers put down material to protect the wood floors and kept it in place with masking tape.  But each time, when the work was done, and the floor protection was removed, the masking tape took off part of the polyurethane coating on the floors.  While I went back and patched the problems, it was clear that the floors needed to be refinished.  They have had no professional work done in the 40 years since the house was built.

Refinishing the floors involves sanding off the current finish and then applying a new finish.  We want to do all the floors at the same time, so all the furniture on the wood floors needs to be moved off of the floors.  The best way to do that is to call some movers to move out all the furniture, store it for a couple of weeks, and then move it back.  The only rooms we are not emptying are the utility room, kitchen, and the 3 bathrooms -- they all have tile floors.  But the dining room, living room, library, bedrooms, closets -- all of those rooms need to be emptied. Which means we have no beds, and no place to sleep.  

Luckily, our (adult) children live in town and had planned a joint two week trip to New Zealand in the middle of October.  So we arranged (a) to stay in our temporarily empty kids' places, (b) to have a moving company take everything away, store it, and bring it back two weeks later, during which (c) the floors are sanded, stained, and refinished

We found a long list of companies in town that would refinish our floors.  We tried to contact Boatright, since they put the floor in when the house was built, but we just could not get them to respond.  We had three other companies come out and quote the job, and decided to go with ATX Wood Flooring with an estimate of $10,950.  They were able to schedule the work for October 11 to October 25.

Next we contracted with Square Cow Movers to move all our furniture out on October 10, and bring it all back on October 26.  Their cost was based on time and distance, so the total cost would depend on how long it took for them to load up the truck (actually two trucks), plus the space in the warehouse to store everything for two weeks.  It ended up costing $2500 to move out, $240 to store everything, and $2000 to move back in.  Things went so well with the refinishing, we were able to reschedule the move back in to October 25.

Knowing that we needed to move everything out on October 10, we spent the weeks before that packing up.  Books, CDs, DVDs, all had to be put in boxes. Furniture needed to be disassembled for moving.  Clothes, bedding, pillows needed boxes.  We got boxes from Lowes, Home Depot, and 1/2 Price Boxes. $169.55 for boxes.  Mostly small book boxes, but also 5 wardrobe boxes for the hanging clothes from the closet and a few large boxes for pillows and other bedding.



Finally, on October 10, the movers showed up and took all the boxes and furniture away.


With the house empty

Dylan moved his equipment in and started sanding the floors.

 

After sanding, the floors would stained and sealed, and then two coats of finish put on them.  The finish is Bona Traffic GO Waterborne Wood Floor Finish.


After all the work was done, the floor needed to cure for 3 days.  


On October 25, the movers brought everything back and in a little over a week later, we had things mostly back in place.


As a side effect of having the floors refinished, we cleaned everything we could think of -- dust, vacuum, ... -- including changing all the filters for the air cleaners and A/C system.