Thursday, November 11, 2010

Replacing Windows (Part 3)

November, 2010

We are having the last set of the old metal frame windows replaced with wood frame windows. This is the third time we've done this and finally replaces all the windows in the house.

We are again using Renewal By Andersen, a nationwide chain of window replacement companies. A phone call to them set up a meeting for a person to come out and measure all the windows, settle on options (color, trim, screens) and provide a cost. We had 17 windows left to replace.

Mostly it's a one to one replacement, but in the dining room, the current windows are two very large windows, and while it would be possible to replace them with two new very large windows, our experience with very large windows is that they are hard to work with. So I suggested that they replace the two windows with three. That meant we were replacing 17 windows with 18 new windows.

The total cost was $25,705. This includes the windows, the labor and materials to remove the old windows and install the new ones, and finish them. We went with an exterior aluminum cladding (Terra Tone), with an oak veneer interior. The actual window is a mix of wood and plastic that is supposed to be very stable. The oak interior will be stained to match our current oak floors and window trim, and then sealed with a coat of polyurethane. I expect to go back and sand everything down and put a second coat of polyurethane on since I believe everything needs two coats.

I put $13,000 down on 11 Oct 2010. The local company then sends the measurements off to the factory (in Minnesota or some place) which makes them to order and then trucks them down here. I got a call on 3 Nov that the windows were here and scheduled them to install them on Wednesday 10 Nov. The rough schedule suggested it might take 3 days to install them (Weds, Thurs, Fri).

Come Wednesday, no one showed up. I got a call that the crew was running late on the previous job they were doing, but would be there on Thursday.

On Thursday, 3 guys show up, and today they replaced 12 of the windows. As an example, here is a picture of the old dining room window.



First the window panes were removed, and then the frame was removed. This created a large hole in the wall where the windows used to be.



Now the new windows can be put in place and screwed in place to the framing around the old window. Spacers are constructed and put between the two windows, or in this case between the three, since we replaced these two big windows with three windows, to make them smaller and easier to manage.

r

Once the windows are all securely in place, oak trim pieces are attached to cover the space between the windows, and quarter round put all around the frame where the windows meet the sheetrock to finish it off.



The outside of the window is filled with an expanding foam sealer, to keep it air tight, and a finished trim piece attached. Since some of these are in a stone exterior wall, someone will come over and mortar around the windows on the outside, to blend it in with the existing stone exterior.

Today, Thursday, all of the windows except the ones on the back porch were replaced and sealed. The exterior trim will be done tomorrow (Friday), as will the remaining windows. At least that is the plan.

December 2 Follow-up.

The inspector from the City of Austin came today. A building permit had been taken out to replace the windows, and the inspector came to check things out. By and large things went well. There were two (or three) problems. One was that the windows next to the door have to be "tempered" glass, not regular glass. So this means that the window next to the sliding patio door needs to be replaced. Someone said this requirement is because you can really slam a door, and vibrate the wall, and a window within two to three feet could then break. Not at all clear that this reasoning applies to a sliding patio door.

The other problem was the windows in two of the bedrooms. We didn't have these replaced this time, but apparently the third problem was that Renewal by Andersen had failed to take out a building permit for the previous window replacement work. In the second part of the window replacement, we took out the sliding windows that were in these bedrooms, and never really worked very well, and put in two side-by-side double hung windows. These work much better, and look better. All in all, a substantial improvement. Except they apparently do not meet code. The problem, as explained, was that in a fire, they are not big enough to get out. So the inspector said they had to be sliding or casement windows. I've had both before and prefer these double hung windows.

We'll see what happens on these issues in the future.

Monday, November 1, 2010

Back to the rocks

Having finished the back deck, it's back to the rocks. The general approach is to break all the big rocks into smaller rocks -- small enough to be moved out.



As an example, here is the big rock in the South-Western corner of the pit.




We use the jackhammer to split it into many smaller pieces.



and the result is a jumble of rather large rocks, probably weighing over 100 pounds. In this case, I think we broke the original rock up into eight smaller rocks. The intent is to make them as large as they can be, subject to the constraint that I have to be able to move them.



Once we have them broken up, we can move them out to the front of the house and put them on the curb. We post this on Craig's List under the "Free" category as "Landscape Rocks". In this case, our post is dated 6:00 pm on November 1.

Friday, October 29, 2010

Refinish the Backyard Porch

The weather has been warm and dry, so it seems like a good idea to refinish the back deck. The deck is made of ipe, and has turned silver almost everywhere.

First, we move everything off the back deck. Everything except the gas grill. It took 3 or 4 guys to get it up on the deck, and it would be very difficult to get it down. But since it is on wheels, I can just move it around to work around it.

Next, I pressure wash the whole deck. This takes a day or two. I have a small consumer level power washer, and that seems to work well enough. It then takes 3 or 4 days for the deck to dry completely.









We use Australian Timber Oil by Cabot to finish the deck. I rub it on with a lambs wool applicator since that is what the can recommends. The deck has a lot of splinters, suggesting that maybe I should have sanded it after the power wash.
It took 2 full gallons to cover the deck.








I still have the corner under the gas grill to coat. I have a small quart can to use for that area.

Tuesday, October 26, 2010

Extracting the rock

Now that we have dug out all the dirt, we need to get the rock out. We start with all the exposed rock.




We start breaking the rock up into smaller pieces.



And once it is broken up into manageable pieces -- 80 to 200 pounds -- we can pull it out, leaving behind a lot of smaller pieces.




What to do with the larger pieces? We haul them around to the front of the house and put them on the curb. We started with two rocks from before the heart surgery.





and now we have a much larger crowd. We should be able to get rid of these by posting them on Craig's List as "Landscape Rocks". But we may wait until we get even more out of the back.

Sunday, October 17, 2010

Completion of Excavation in the South Pit

October 2010

I've finished excavating the rectangular area between the fence and the raised garden. By that, I mean that all the dirt has been removed. This exposes the
underlying rock structure.




Notice that from the other angle there is clearly a round hole in the rock.



Let's look at that up close. This hole was put in for an ornamental cherry or peach tree that was part of the original landscaping. The tree died a couple years ago, so it lasted about 20 years. One problem might have been that it just did not have any place to grow to other than it's hole.

There are actually two holes -- there is another one closer to the fence that I put in a couple years ago for an olive tree. It didn't last thru the first winter.




The next step will be to remove this exposed later of rock. There are some probable seams between the rocks, but even so, the rocks themselves are much too large to be lifted out. I'll have to use the jackhammer to break them up into more manageable pieces of no more than a couple hundred pounds each.

Once the rock is removed, I will be able to put back the dirt, upgraded with as much organic material as I can get -- leaves and grass clippings. Then when we want to plant another tree, there should be a lot of space for it to expand into.

Friday, October 8, 2010

Digging in the South Pit

October 2010


I'm back to work digging. I was out for awhile with heart surgery, but they say I can go back to digging now. When I left off in June, the corner of the back yard looked like this:




So getting back to work, I enlarged the area that had been excavated to a rectangle.



We had a problem that the dog fell into the pit and couldn't find her way out, so I build a short PVC fence to keep her out.



The next few days were just expanding the excavated area.






This morning (Friday, 8 Oct), was more of the same -- expanding the area that we have dug down to rock.



Of course, we need a place to put all the dirt being dug out. We get about two or three wheelbarrows of dirt for every one of rock.




The pile of dirt just gets bigger, day by day.


Tuesday, July 13, 2010

Mortgage paid off

We made our last mortgage payment.

When the house was built in 1986, we took out a 30-year mortage to finance it.

  • 15 July 1986 -- 30-year mortgage for $200,000 at 8.5% interest
  • 15 April 1994 -- 30-year mortgage for $159,200 at 5.99% interest
  • 11 December 2000 -- 15-year mortgage for $140,000 at 7.25% interest
  • 14 October 2002 -- 15-year mortgage for $125,800 at 5.75% interest
We were aggressive in paying extra principal when possible.  Even so, it took 24 years and $227,651 in interest to pay off the original $200,000 mortgage.

Wednesday, June 30, 2010

End of work for awhile

Sprinkler system repair

We have been having a minor water leakage problem in the back yard. The initial problem was there was a damp spot in the back yard right at the fence. I tried to read the meter at the street, and then read it again 3 hours later with no one home but me. No change in the meter. So I wasn't sure it was ours.

But when I started to dig there, I found a sprinkler head. So I took the head out and capped it off. That stopped the leak. Or at least it did at that spot. Now there was a new wet spot out in the yard. Again, this was another head and I capped it off. I want to excavate and rebuild this section of the back yard anyway.

This worked for several weeks, then a new wet spot showed up about where the zone control valve should be. I have never replaced a control value, and it turns out I need to have open heart surgery, so I called Jonathon Griesheimer, who had previously replaced the main sprinkler control value for me. His phone is 512-836-6539. I didn't have the time to figure out what the problem was before I went in for surgery.

But while I was in the hospital, he came out, figured out the problem and put in a new valve. There was an indirect comment, thru my girlfriend's daughter that the valve is too far underground. Which would be expected, since we have been raising the level of part of the back yard in this area. This then took 3 hours of labor to dig everything up and replace the leaking parts. $260.

So that solves that problem, and I'll just have to wait for another 6 weeks or so before I can consider going back to work.

Monday, June 14, 2010

Replacing a toilet in the guest bathroom

We've had a suspicion that the toilet in the guest bathroom leaks, at a low level. But it also has a tendency to get clogged, and it's a 25 year old model, so the current ones should use much less water. And that bathroom is next up on interior remodelling, so rather than repair it, we will just replace it. 

The unit we have in the back bathroom seems to be working fairly well. It's an American Standard Champion 4 model. We can get this from Home Depot, but only in white. Linda says she wants "Linen" which is an off-white, and that needs to be special-ordered. I order it on 22 May 2010. $500.93 for the Toilet -- Right Height, Elongated Bowl, plus the matching toilet seat. It finally comes in on 8 June, but then we have Lauren's high school graduation, so I don't get to installing it until 13 June. 

Everything goes very well at first. Removing the old toilet is as expected. Removing a bunch of bolts. Turn the water off at the wall. Take the pieces outside, with as little water leakage as possible. Clean out the old wax ring that was under the old toilet. 

Turn off the water supply to the house, and replace the cut-off valve at the wall with a new one. I have trouble putting the new wax ring in place. The box with the wax ring says to press it on the up-side down toilet and then "set it in place". But when I flip the toilet over, the wax ring falls off. And positioning the new toilet bowl over the bolts is difficult, since you can't see the bolts when they are under the toilet bowl. 


 Finally get it set in place, and bolted down. Then attach the tank, and a new water supply line. Everything goes together just right -- no leaks. 

Then flush the toilet the first time, and it leaks under the bowl -- flowing gently out along the floor. 

So I take everything apart. The water supply line. The tank. Remove the bowl. The wax ring had shifted and half covered the hole into the floor. Remove it. Back to Home Depot to get another wax ring. Reinstall just the bowl. Test it this time by pouring water into the bowl with a bucket. Still leaks. Take it apart. The ring is pretty much in the right place. But normally when I've put in toilets, after installing the wax ring and putting the bowl on top, it's squishy as the bowl compress the wax ring into place, sandwiching it between the floor and the bowl, spreading out slightly and sealing everything. I had not noticed that this time. So it would seem that this unit is a bit further from the floor than a normal toilet bowl. 

Back to Home Depot again. In addition to the normal wax ring, they have an "extra thick" one. Costs an extra dollar, but it's about twice as deep. Put that in place around the hole in the floor. Position the bowl on a couple of pieces of wood to hold it up until the bolts show through the bolt holes, then pull the wood out and lower the toilet bowl. Feel it squishing the wax ring as I press down on the bowl and tighten the bolts. This time it works; no leaks. Put the rest of it back together. 

Altogether it took about 6 hours, but that included three installations, two removals, and two trips to Home Depot.

Monday, May 24, 2010

Digging in the corner of the yard

Not much to report for this weekend. I was able to dig for a couple of hours on Sunday. I'm starting in a new corner of the yard. The objective is to clean out this section of rocks, and upgrade the soil, so we can move the oak trees from the area by the box over here.




I'm starting in the corner and working my way out. I'm still a foot or so away from the actual fence line, so that it holds the fence in place while I dig. Once I get it in the condition I want, I'll pour an edge wall with rocks on top next to the fence, to keep things from digging in or out under the fence.

So far it looks like a classical dig. Lots of smallish rocks -- smaller than a watermelon -- and a couple of really big ones. I've pulled them out of the hole, but I still need to move them out of the way. I'm not sure yet how much dirt is under the big rocks; I'll work more on it next weekend, with any luck.